Review LEPIN 37002 Borkum Riffgrund 1

This is the LEPIN [] LEPIN 37002 Borkum Riffgrund 1 Real Reviews from our lovely customer nickname Wolfgang Grunewald at Germany.

After reading the set for the second time, I have a review here

The set was ordered from a dealer from LEPINLand, delivery took place within two days with DHL in original box and BA. So not as in Other Store in neutral packaging

6bff5e23c2346692c9ef9df73a69e6d5 1

Delivered in the original box, construction and look like LE..G0

Lepin_37002_02.jpg

Everything neatly packed in bags but not sorted by stages

Review LEPIN 37002 Borkum Riffgrund 1

in a box 14 bags + construction manual

Review LEPIN 37002 Borkum Riffgrund 1

Somewhat unattractive are the burrs on the tower segments

Review LEPIN 37002 Borkum Riffgrund 1

The base plate for the wind turbine is ready. Fit and firmness of the
Parts is the original in nothing

Review LEPIN 37002 Borkum Riffgrund 1

The waves and the foundation were put on

Review LEPIN 37002 Borkum Riffgrund 1

The machine house is already finished, not really difficult to build

Now begins the assembly of the bodybuilder, here it is a bit more expensive than the windmill itself

Review LEPIN 37002 Borkum Riffgrund 1

The base plate of the ship has already been built

Review LEPIN 37002 Borkum Riffgrund 1

The first mechanics for the submersible posts of the ship was built.
An error had crept in here, because in the middle still had to
a gear (overlooked in the BA)

Review LEPIN 37002 Borkum Riffgrund 1

The mechanics were placed on the base plate. Here I noticed the mistake then :)

Review LEPIN 37002 Borkum Riffgrund 1

the second part of the lifting mechanism with base plate for the crane

Review LEPIN 37002 Borkum Riffgrund 1

Both mechanics have now been connected, so the mechanics will run synchronously later

Review LEPIN 37002 Borkum Riffgrund 1

At the back and at the front, the guide for the support was set up and the deck was disguised

Review LEPIN 37002 Borkum Riffgrund 1

The crane mechanics was started

Review LEPIN 37002 Borkum Riffgrund 1

The crane is complete

Review LEPIN 37002 Borkum Riffgrund 1

The bridge was built

Review LEPIN 37002 Borkum Riffgrund 1

The bridge and the supports are installed and the last side paneling is still missing

Review LEPIN 37002 Borkum Riffgrund 1

The windmill can optionally be transported disassembled on the ship

Review LEPIN 37002 Borkum Riffgrund 1

Or you build the wind turbine on us, the ship next to it, optionally with extended supports or just ready for departure with retracted supports

All in all, the LEPIN Le..g0 looks like a real LE..G0 in terms of assembly, All the stones are confirmed and you have to do the parts again. To the Luck is the set but also a Zerlegehilfsmittel in order to make it easier does.

I hope you liked my first review here.

Buy LEPIN: Click HERE

Schreibe einen Kommentar

de_DEGerman