This is the LEPIN [] 37001 – Wind Turbine (4999) Real Reviews from our lovely customer nickname Max Nagel at Germany.
Today the friendly DPD man was there! After not even 8 days, I finally hold my wind turbine in my hand and the shipping went this time almost as fast as with DHL Express. I had my windmill at 06.06. ordered at LEPINLAND Store via SF Express.
The package was neatly packaged and the stones even had some space left in their box.
Inside the box was a bag containing the building blocks, the baseplate and the manual
Here are the instructions
And the stickers. The quality seems to be pretty good, reasonable wearer and beautiful shine
The building board was loose in the big bag and is the best I have seen on building boards so far from Asia. It is absolutely flat and as thick as the plates of the Danes.
Also loosely lay the four 4X10X6 Mountain Bottom stones in the bag. They have no scratches and are produced clean.
The electrical system also looks good. Battery box, motor, and lamps work, as I had in the past had other experiences. The engine seems to be very powerful but is also a bit louder than its prototype but not as loud as the one from the Grand Carousel.
Here are the 21 bags (one has hidden) with the terminal blocks and a little surprise
Surprise! Unfortunately, one recognizes only badly here, but the windows are once again packed in bags!
The bags are not numbered according to construction sections in this set and are now made of the same material as the Xingbao bags. They no longer crackle so nicely, are a little softer / tougher and cannot be so beautifully torn.
Lepin still cannot produce the part “String With Knobs 10 M”, but the thread in this set is already assembled.
The figures are great! Not very fancy (the originals are not synonymous) but can consistently put together well, the arms snap clean (all the same) and have a clean pressure.
Let’s start with the delivery van
The chairs still have not corrected Lepin
Here the above-mentioned bag with the discs
The slices are clear, not milky
The finished delivery van
And go to the hut
Here Lepin has finally done the homework, 1: 1 is really really 1: 1
And another positive find, the flowers have finally been redesigned and are now really stuck.
The hut is ready
Continue with the hill behind the house and the “foundation” for the tower
There is a little mistake here. The 1×4 plate cannot be used because of the connectors as shown in the construction manual. I’ve just moved it down, the effect is the same.
Pretty long part
Incidentally, the clamping force of the stones is excellent and at the same level as the Xingbao (eg Vespa) stones. The Danes have also thought through the model well, it is built much offset and thus achieved good stability.
The bottom of the tower
The tower was put into the foundation and the battery box was installed
Now the battery box is still hidden
If you are not careful you can sometimes get confused with the sequence of construction steps. I have seen this 2-3 times in this manual.
I have two small and one big tree, according to the construction manual it should be different.
The following parts are left over
And a complete bag of spare parts
Light is burning too
The model in full size
A small video of the wind turbine in function
Conclusion: Anyone who is interested in the model can strike without hesitation. The stones have a great clamping power and a nice shine. The electrics work as they should, the engine is a bit louder than the original. All Nickligkeiten the set I have described above more negative there is not to say.
Addendum # 1: The four black “Roof Tile 3X3 / 25 °” are smooth/shiny all other oblique stones are dull or rough.